Adrenaline Gym T-Shirt | Vintage Weightlifting Tee, Bodybuilding Apparel

Adrenaline Gym T-Shirt | Vintage Weightlifting Tee, Bodybuilding Apparel

Black / S
$25.00
Skip to product information
Adrenaline Gym T-Shirt | Vintage Weightlifting Tee, Bodybuilding Apparel

Adrenaline Gym T-Shirt | Vintage Weightlifting Tee, Bodybuilding Apparel

$25.00
Primary color
Size
Fuel Your Workout! Smash your next PR with the ultimate statement piece for the iron addict. Featuring a gritty, distressed badge design with the slogan "ADRENALINE. MY DRUG OF CHOICE," this tee is designed for those who live for the pump and the rush of a heavy lift. Whether you're hitting the bench, deadlifting, or crushing a HIIT session, this vintage-inspired graphic brings the energy you need. The Design • Classic Badge Aesthetic: A retro circle emblem featuring a high-voltage lightning bolt and heavy barbell. • Distressed Finish: Printed with a subtle grunge texture for that perfectly worn-in, old-school gym vibe. • Bold Typography: Maximum readability that stands out across the gym floor. The Fit & Feel This includes 3 color options to match your gym fit rotation: 1. Classic Black: For the stealth mode, hardcore lifter look. 2. Clean White: A crisp, high-contrast look that pops against gym lighting. 3. Athletic Gray: The essential heather grey sweat-wicking aesthetic. • Material: Premium, soft-spun cotton blend (lightweight and breathable for training). • Fit: Unisex/Men’s Athletic Cut (True to size – size up for an oversized "pump cover" look). • Durability: Double-stitched neckline and sleeves to withstand daily grind. Perfect Gift For: • Powerlifters & Bodybuilders • Personal Trainers • Gym Rats & Fitness Enthusiasts • Anyone addicted to the grind!

You may also like