Vintage Gym Therapy T-Shirt | Old School Bodybuilding, Powerlifting

Vintage Gym Therapy T-Shirt | Old School Bodybuilding, Powerlifting

Black / S
$25.00
Skip to product information
Vintage Gym Therapy T-Shirt | Old School Bodybuilding, Powerlifting

Vintage Gym Therapy T-Shirt | Old School Bodybuilding, Powerlifting

$25.00
Primary color
Size
The iron is the best medicine. Raise the bar with our signature "Gym Therapy" Tee. This isn't just a workout shirt; it's a statement. Featuring a premium double-sided print, this tee combines old-school bodybuilding aesthetics with modern streetwear style. Whether you are hitting a PR on the squat rack or just recovering on rest day, this shirt lets everyone know where your true therapy session happens. THE DESIGN • Front: Features a subtle, classic crest logo on the left chest area, perfect for a clean look from the front. • Back: showcases a massive, bold, vintage-inspired graphic of a lifter conquering a heavy squat, surrounded by the "Gym Therapy" and "Raise the Bar" typography in retro orange and teal hues. • Style: The graphic features a slight distressed/grunge texture to give it that authentic, worn-in vintage gym vibe. SHIRT QUALITY & FIT • Material: 100% Ring-Spun Cotton or Soft Cotton/Poly Blend. • Feel: Soft, breathable, and durable enough to handle your toughest sets. • Fit: Unisex sizing / True to size. • Colors: Available in Classic Black, Crisp White, and Athletic Heather Gray. PERFECT FOR • Bodybuilders and Powerlifters who love the "Golden Era" aesthetic. • Personal Trainers and Gym Rats. • Anyone who believes the gym is their mental health outlet. SIZING Please refer to the size chart in the listing photos to ensure the perfect fit. If you prefer an oversized "pump cover" look, we recommend sizing up 1-2 sizes.

You may also like